Business tenders

Ti.Ref No :- 485772537


National And Regional Consulting Firms For Preparation Of A Joint Project In The Sesan, Sekong And Seprok (3s) Sub-basin Of The Mekong Riverfor Our Mrc Project








ORGANISATION DETAILS
Organisation Name: THE DEUTSCHE GESELLSCHAFT FR INTERNATIONALE ZUSAMMENARBEIT (GIZ) GMBH
Address: P.O. Box 81
Phnom Penh
Cambodia+855-23 860 110


PREQUALIFICATION DETAILS
Document Type: Tender Notice
Bidding Type: Not Specified
Project Location: Cambodia
Tender Notice No:
Description: Tenders are invited for National and Regional Consulting Firms for Preparation of a Joint Project in the Sesan, Sekong and Seprok (3S) sub-basin of the Mekong Riverfor our MRC Project

National and regional consulting firms for preparation of a joint project in the sesan, sekong and seprok (3s) sub-basin of the mekong riverfor our mrc project Scope of Work: MRC-GIZ Cooperation Programme is preparing a Joint Project in the 3S sub-regions between Cambodia, Laos, and Viet Nam. This project, therefore, calls for a consulting company to conduct assessment and identify measures for a joint project for transboundary cooperation for sustainable water resource management in the Sekong, Sesan and Srepok (3S) sub-basins in the Lower Mekong Basin in cooperation with the Mekong River Commission (MRC). Main Tasks: The specific tasks/activities have been grouped into five work packages (WP). The contractor will provide the following services: Conduct data collection in the 3S sub-basin in Sesan of Cambodia, Sekong of Lao PDR and Seprok of Vietnam, and data analyse as part of a Basin Diagnostic Analysis. Develop a digital reference map for the 3S sub-basin including the integration of all collected data and analyses as a common internet-based georeferenced database to support decision-making processes. Establish transboundary steering mechanisms and prepare implementation agreements including the terms of reference for the national working groups and the regional steering committee in the 3S sub-basin. Design and conduct capacity development measures for the national working groups. Define joint priorities on transboundary measures and propose measures for future joint project design for three countries for the 3S sub-basin for future transboundary cooperation with regard to sustainable water resource management and climate change adaptation.


Deadline: 2023-03-29
Related Documents

Orginal Document

SECTOR
Water and Sanitation; Consultancy; Engineering;
DISCLAIMER
For accuracy, please refer to the text in the original language in the attached document.